Uguccioni Ponteggi

Portfolio

PVC Covers

Due to temporary work covers non-STOP.

Due to the provisional system covers produced by installing prefabricated beams and pvc sheets, the site remain protected from any type of inclement weather such as rain or snow, and thus ensuring the continuity of the work. The sliding system on Rails, made over the prefabricated beams, will allow groundwater to flow towels within them in order to allow the unloading of pallets by construction cranes and guaranteeing, once the unloading phase, the perfect closing and impermeability of rainwater.